Driving between Matsuyama Airport, Matsuyama Kanko Port, JR Matsuyama Station and Matsuyama City Stationwhere to drop off, official travel times, taxi stands and rental car offices
For people who drive between Matsuyama Airport, Matsuyama Kanko Port, JR Matsuyama Station and Matsuyama City Station, or who pick up and drop off others. Where to stop at each place, the travel times on official pages, and the locations of taxi stands and rental car offices, checked on the official pages of the airport, the port, Matsuyama City and the companies.

Summary
- The Matsuyama Airport page says about 15 minutes from JR Matsuyama Station, about 20 from Matsuyama City Station, and about 20 from Matsuyama Kanko Port.
- No stopping or parking in front of the airport terminal except some drop-off lanes. The airport asks those meeting or seeing off people to use the parking lots.
- Since July 16, 2024, private cars and taxis at Matsuyama City Station use the west rotary. Private cars enter its loading area from Hanazono-machi intersection.
- JR Matsuyama Station has about 18 private car parking spaces at the east exit and no dedicated pick-up/drop-off area; the west exit one is planned for FY2028.
- Not found on official pages: the car time between JR Matsuyama Station and Matsuyama City Station, and the drop-off place at Matsuyama Kanko Port.
Times written on official pages, from the stations and the port to the airport
The Matsuyama Airport official page “Access to the airport” (空港までのアクセス) has a table of approximate travel times to the airport, by starting point. Of the 4 places, the times from the other 3 to the airport are in this table.
| Starting point | Approximate time to the airport | Means written in the table |
|---|---|---|
| JR Matsuyama Station (JR松山駅) | About 15 minutes | Car, limousine bus |
| Matsuyama City Station (松山市駅) | About 20 minutes | Car, limousine bus |
| Matsuyama Kanko Port (松山観光港) | About 20 minutes | Car |
Below the table, it says “Travel times change with traffic conditions and other factors.” The times for JR Matsuyama Station and Matsuyama City Station are for car and limousine bus together.
The “Access” page of Matsuyama Kanko Port Terminal (松山観光港ターミナル) has a table of taxi (regular car) fares and standard times between the city of Matsuyama and Matsuyama Kanko Port. It is not the time for your own car, but it can be read as a guide from the port to the other 3 places.
| Destination | Regular car taxi fare | Standard time |
|---|---|---|
| Matsuyama Airport | 3,200 yen | 20 minutes |
| JR Matsuyama Station | 3,300 yen | 20 minutes |
| Matsuyama City Station | 3,500 yen | 20 minutes |
The table also lists JR Mitsuhama Station (JR三津浜駅; 1,600 yen, 10 minutes), Matsuyama Castle Ropeway (松山城ロープウェイ; 3,600 yen, 20 minutes), Ichibancho (一番町; 3,700 yen, 25 minutes) and Dogo Onsen (3,800 yen, 25 minutes). The note is as follows.
注1:時間距離併用制運賃のため、交通事情により異なることがあります。
Translation: “Note 1: The fare uses a combined time and distance system, so it may differ depending on traffic conditions.”
The car travel time and distance between JR Matsuyama Station and Matsuyama City Station are not stated in the listed sources. The distance (km) was also not on the official pages we opened, for any pair of the 4 places.
The numbers match the list below and are not a driving order. Tap a number on the map, or "Navigate in Google Maps" in the list, to start directions to that place.
Point locations: © OpenStreetMap contributors (ODbL), GSI place name search
- Matsuyama Airport Passenger Terminal (松山空港 旅客ターミナルビル): By car, about 15 minutes from JR Matsuyama Station, about 20 minutes from Matsuyama City Station, and about 20 minutes from Matsuyama Kanko Port (airport official page).Navigate in Google Maps
- Matsuyama Kanko Port Terminal (松山観光港ターミナル): The parking lot has 266 spaces. The taxi stand and the scheduled bus stop are on the 1st floor (terminal floor map).Navigate in Google Maps
- JR Matsuyama Station (JR松山駅): The taxi boarding and drop-off area is next to the station building. For private cars, a city document lists the boarding and drop-off columns as "-" and parking at about 18.Navigate in Google Maps
- Matsuyama City Station (松山市駅): Taxis and private cars use the west rotary. The west rotary is entered from Hanazono-machi intersection.Navigate in Google Maps
Matsuyama Airport: the drop-off place is fixed, and it is separate from the boarding areas
How to stop in front of the airport terminal, the parking fees and the change of roads inside the airport are in Parking at Matsuyama Airport and where to stop for drop-off. Here we write only what you need when moving from the airport to the other 3 places.
The airport official page “Car and motorcycle” (車・バイク) says this about the roads inside the airport.
松山空港旅客ターミナル周辺の道路は、一部の降車レーンを除き駐停車禁止となっています。
Translation: “The roads around the Matsuyama Airport passenger terminal are no-stopping and no-parking, except for some drop-off lanes.”
お見送り・お出迎えのお客様は、駐車場をご利用ください(入庫後30分まで無料)。
Translation: “People seeing someone off or picking someone up, please use the parking lot (free for up to 30 minutes after entering).”
The place to drop off family or luggage appears as “private car drop-off area” (一般車専用降車場) on the site map on the same page. In the map, the private car drop-off area, the taxis, the limousine buses, and the entrances and exits of Parking Lots 1 to 3 are drawn at separate positions.

About the taxi stand, the airport “Taxi” (タクシー) page says the following.
タクシーのりばは、到着ロビーの正面出入口を出て、右手側にあります。
Translation: “The taxi stand is on the right side after you leave the front exit of the arrival lobby.”
The same page lists the reservation desk of the Ehime Prefecture Individual Taxi Cooperative (愛媛県個人タクシー協同組合; 0120-71-2441, weekdays 8:30 to 17:00, closed on Saturdays, Sundays and holidays) and the taxi app “GO” (reservation only).
Where the reception is when you rent a car, and how to go to the office, are in What to know before renting a car at Matsuyama Airport.
Matsuyama Kanko Port: the drop-off place for pick-up and send-off is not on the port’s pages
The “Facility guide” (各種施設案内) of Matsuyama Kanko Port Terminal Co., Ltd. has a guide to the parking lot (paid). It has 266 spaces, hours are 4:00 to 23:00, and the fee is 100 yen per 50 minutes, with a flat 1000 yen for over 7 hours 30 minutes up to 24 hours. Details are in Leaving your car and taking a boat.
The official pages of the port terminal (“Access” and “Facility guide”) have no guide to where a private car may drop off people, or where it may stop briefly for pick-up and send-off. If you will meet someone at the port, including how to use the parking lot, please check with the terminal (089-967-6667).
The floor map of the terminal 1st floor draws the taxi stand and the scheduled bus stop outside the front entrance. The counter of Toyota Rental & Leasing (トヨタレンタリース; Toyota Rent a Car Matsuyama Kanko Port office) is also on the 1st floor.

The ways to go from the port to the city without a car are on the same “Access” page.
- The limousine bus from Matsuyama Kanko Port to Matsuyama City Station is written as “only 1 trip a day”, and the time is about 30 minutes.
- From Matsuyama City Station to Takahama Station (高浜駅), the Iyotetsu suburban train takes about 21 minutes.
- From Takahama Station to Matsuyama Kanko Port, the Iyotetsu Bus connecting bus takes about 2 minutes, and it is written as fully cashless.
The road from Matsuyama Kanko Port to Dogo Onsen is in From Matsuyama Kanko Port to Dogo Onsen.
JR Matsuyama Station: about 18 private car parking spaces at the east exit, and a private car pick-up and drop-off area at the west exit planned for FY2028
At JR Matsuyama Station, use of the elevated tracks began on September 29, 2024, and work on the roads and station plazas around the station is still going on (Matsuyama City’s construction progress page). First, here is what we found on the official pages and documents of the city, the prefecture and JR Shikoku about where to stop a car when you pick up or drop off someone.
Where to stop for pick-up and drop-off: what the official documents say as of October 2026
- East exit: The station plaza has parking for private cars. In the table of document 3 of the 7th Matsuyama Station Town Meeting on October 6, 2026, the private car boarding and drop-off columns are “-” and the waiting column is about 18. The table has no dedicated boarding and drop-off area for private cars.
- Where the east exit parking is: In the layout figure of the same document 3 (page 2 of the PDF), the words “一般車駐車場” (private car parking) are placed in 3 spots. One is east of the taxi boarding and drop-off marks, on the north side of the taxi waiting area, and the other two are on the south side of the plaza.
- West exit: In Ehime Prefecture’s figure “JR松山駅周辺整備事業の状況” (status of the JR Matsuyama Station area improvement projects), “⑨西口駅前広場” (west exit station plaza) is labeled “タクシー、一般車乗降場” (taxi and private car boarding and drop-off area) with “R10年度完成予定” (planned completion in Reiwa 10). Reiwa 10 is fiscal 2028.
- Time limit and fee: The time limit, the fee and any free minutes of the private car parking at the east exit are not on the official pages of the city, the prefecture or JR Shikoku.
About the west exit plaza work, Matsuyama City’s “JR松山駅周辺の工事進捗状況” (construction progress around JR Matsuyama Station, updated October 5, 2026) says the following.
JR松山駅周辺では、松山市が西口駅前広場のほか、市道「松山駅西南北線」や「三番町線」などの工事を進めています。
Translation: “Around JR Matsuyama Station, Matsuyama City is carrying out work on the west exit station plaza, as well as on city roads such as ‘Matsuyama Station West North-South Line’ and ‘Sanbancho Line’.”
In the prefecture’s figure, the east exit station plaza (⑩) is also labeled “R9年度仮設バス停完成予定” (temporary bus stops planned for completion in fiscal 2027) and “R15年度完成予定” (planned completion in fiscal 2033). The east exit plaza is also planned to change shape.
Matsuyama City’s page “JR松山駅・駅前広場計画” (JR Matsuyama Station and station plaza plan, updated September 28, 2026) has a table “駅前広場の現状” (present state of the station plaza). In the table, the east exit plaza’s “自家用車専用バース(自家用車乗降場)” (private car boarding and drop-off berths) is “なし” (none), “自家用車駐車場” (private car parking) is 16 spaces, and the west exit plaza is “なし” (none). The page does not say as of when these numbers are. The number differs from the about 18 spaces in the meeting document.

JR Shikoku parking lots
The page “駐車場【愛媛】” (parking, Ehime) of JR Shikoku Station Development, Matsuyama branch, lists 2 daily parking lots at Matsuyama Station.
| Lot name | Fee | Spaces |
|---|---|---|
| Wakakusa-machi 1 (若草町1) | 500 yen / 24 hours | 36 |
| Wakakusa-machi 2 (若草町2) | 500 yen / 24 hours | 40 |
The locations are shown by links to Google Maps on the same page. The “時間制駐車場” (hourly parking) column on the same page lists Imabari Station West, and no Matsuyama Station lot. The page does not say whether the lots can be used for a short pick-up or drop-off. The contact number is 089-989-9117 (weekdays 9:00 to 17:00).
JR Shikoku’s page “四国の駅情報 | 松山駅” (station information, Matsuyama Station) lists “キスケ駐車場” (Kisuke parking) under “パーク&ライド” (park and ride) in its facility list. The fee and the number of spaces are not on this page.
Roads that lead to the station
- East exit: The layout figure of document 3 shows the names “主要地方道松山港線(大手町通り)” (Matsuyama Port Line, Otemachi-dori) and “市道松山駅前竹原線” (city road Matsuyama Ekimae-Takehara Line) on the east side of the plaza.
- West exit: According to Ehime Prefecture’s announcement (September 1, 2026), the Matsuyama Station West Exit Minami-Edo Line (松山駅西口南江戸線) opened at 3:00 a.m. on September 14, 2026. It is about 490 m long with 4 lanes (2 in each direction). The announcement says: “これにより、松山駅西口と松山環状線(フライブルク通り)が幹線道路で繋がり、松山駅へのアクセスが格段に向上します。” (Translation: “With this, the west exit of Matsuyama Station and the Matsuyama Ring Road (Freiburg-dori) are connected by an arterial road, and access to Matsuyama Station will greatly improve.”)
South of the station, there are traffic restrictions for the construction work. Matsuyama City’s notice “サクラメント通りの工事や松山駅西口南江戸線の開通に伴うお知らせ” (notice about the Sacramento-dori work and the opening of the Matsuyama Station West Exit Minami-Edo Line, updated September 14, 2026) gives the restrictions at the intersection of “松山駅西南北線” (Matsuyama Station West North-South Line) and “三番町線” (Sanbancho Line) as follows.
- Going south on the Matsuyama Station West North-South Line: left turn only (no straight or right turn)
- Going north on the Matsuyama Station West North-South Line: straight or right turn only (no left turn)
- From the Sanbancho Line to the Matsuyama Station West North-South Line: left turn only (no straight or right turn)
The figure on the same page says “通勤時間帯には、混雑が予想されるので、周辺道路の利用にご協力ください。” (Translation: “Congestion is expected during commuting hours, so please cooperate by using surrounding roads.”) About the Sanbancho Line, the city’s construction progress page says the following.
令和8年(2026年)3月から、サクラメント通り(千舟町空港線)のアンダーパス埋戻し工事に伴い、駅西側の松山駅西南北線と高架下をくぐって東西をつなぐ三番町線の迂回路利用が始まりました。
Translation: “From March 2026, with the work to fill in the underpass of Sacramento-dori (Chifunemachi Airport Line), use of the detour on the Matsuyama Station West North-South Line on the west side of the station and the Sanbancho Line, which passes under the elevated tracks to connect east and west, began.”
Matsuyama City’s notice “サクラメント通り アンダーパス埋め戻し工事に伴うお知らせ” (notice about the Sacramento-dori underpass fill-in work, updated September 9, 2026) says the fill-in of the Sacramento-dori (Chifunemachi Airport Line) underpass is planned to be completed around March 2028.
番号は下の一覧と同じで、走る順ではありません。地図の番号か、一覧の「Googleマップでナビ」を押すと、その場所を目的地にして経路案内を始められます。
Point locations: © OpenStreetMap contributors (ODbL)
- JR Matsuyama Station:Private car parking is in the east exit station plaza; about 18 spaces in the city document of October 2026.Googleマップでナビ
- Matsuyama-ekimae intersection:Intersection on the east side of the east exit station plaza.Googleマップでナビ
- Station end of the Matsuyama Station West Exit Minami-Edo Line:The west exit station plaza (taxi and private car boarding and drop-off area) is planned for completion in FY2028 in the prefecture figure.Googleマップでナビ
- Intersection of the West Exit Minami-Edo Line and the Matsuyama Ring Road:The Matsuyama Station West Exit Minami-Edo Line opened on September 14, 2026, linking the west exit and the Matsuyama Ring Road (Freiburg-dori) (prefecture announcement).Googleマップでナビ
- Intersection of the West North-South Line and the Sanbancho Line:Traffic restrictions during construction. Going south on the West North-South Line: left turn only; going north: straight or right only (city notice).Googleマップでナビ
Present state and future plans in the city meeting documents
The JR Matsuyama Station plaza is a place where Matsuyama City is studying a redevelopment plan in the “Matsuyama Station Town Meeting” (松山駅まち会議). Here we line up what the city meeting documents say at 3 points in time (February 2019, June 2025 and October 2026).
Current state in the October 2026 document: taxis have 2 boarding berths, 1 drop-off berth and about 40 waiting; private cars have about 18 parking spaces
Document 3 “On the transport terminal function” (交通ターミナル機能について) of the 7th Matsuyama Station Town Meeting on October 6, 2026 describes the current state like this (figures such as the number of bus services are as of August and September 2026).
JR松山駅東口には、バス(都市間高速・路線・リムジン・不定期)、タクシー、一般車、自転車等が乗り入れており、バス・タクシーの乗降スペースおよび待機場と、一般車向けの駐車場、自転車等駐輪場を備えている。
Translation: “At the east exit of JR Matsuyama Station, buses (intercity express, route, limousine, irregular), taxis, private cars, bicycles and others come in. It has boarding and drop-off space and waiting areas for buses and taxis, parking for private cars, and bicycle parking.”
In the table of the same document, taxis have 2 boarding berths, 1 drop-off berth and about 40 waiting, and for private cars the boarding and drop-off columns are “-” and the waiting column is about 18. Document 2 of the 6th meeting on June 4, 2025 has the same numbers (taxi 2 boarding berths, 1 drop-off berth, about 40 waiting; private car parking about 18), and also this sentence.
タクシーの乗降場は、駅舎に隣接して設けられている。
Translation: “The taxi boarding and drop-off area is provided next to the station building.”
As problems with car movements, document 2 of the 6th meeting lists that the route into and out of the terminal is complicated and has an irregular intersection, so private cars enter by mistake, and that intercity express buses, taxis and private cars use the same flow line, so traffic is obstructed and congested.
On page 2 of the PDF (slide number 1) of the city meeting document 3 (7th Matsuyama Station Town Meeting, October 6, 2026), there is a figure of the traffic layout in front of JR Matsuyama Station (PDF of document 3).
The 2019 document: there was no space for pick-up and drop-off, and people got in and out on the roadway in the plaza
Document 2-5 “Study of the basic plan for the station plaza” (駅前広場等整備基本計画検討) of the 1st Matsuyama Station Town Meeting (February 12, 2019) describes the current state and problems of taxis and private cars like this.
一般車の送迎用乗降スペースはないにも関わらず、実際は広場内車道上で乗降されており、都市間バスやタクシーの走行・乗降を阻害することがある。
Translation: “Although there is no pick-up and drop-off space for private cars, in fact people get in and out on the roadway in the plaza, which sometimes obstructs the running and boarding of intercity buses and taxis.”
The same page says that the “private car parking area” (自家用自動車整理場) at that time had 8 spaces across the roadway from the ticket gates and 6 spaces on the south side of the plaza, that the hours were 8:00 to 20:00, and that the fee was 200 yen for the first hour and 100 yen per 30 minutes after that, free if the car leaves within 20 minutes. The park-and-ride parking lot had 4 spaces. The figures and tables on this page carry the document name “Station plaza use survey (February 3, 2015, Tuesday)” (駅前広場利用実態調査(2015.2.3 火)). The page for the 1st meeting describes this meeting as held before the elevation switch of the Yosan Line (written as planned for the end of fiscal 2023). The present parking fee and hours are not stated in the listed sources.
A figure that shows, with road signs or road markings, where you may and may not stop is not stated in the listed sources. In front of the station, please follow the signs and guidance.
What is planned to change: a plan with a private car drop-off area and short-time parking at the west exit
The October 2026 document 3 has a plan to divide the station plaza into an east exit and a west exit. The west exit plan has 4 private car drop-off berths, 7 short-time parking spaces, 1 boarding and drop-off berth for people with disabilities, and for taxis 2 boarding berths, 1 drop-off berth and 12 waiting berths. The east exit plan has about 2 berths each for private car boarding and drop-off, and about 18 waiting spaces. Document 3 writes that, for vehicles entering the transport terminal at the east exit (the target of entry to the specified vehicle stopping facility), private cars are “not allowed to enter under the ministerial ordinance”. These are numbers in a plan, not numbers of a facility that has been built.
The fees and the number of daily spaces of the JR Matsuyama Station parking lots are in Parking in central Matsuyama.
Matsuyama City Station: private cars and taxis use the west rotary since July 16, 2024
At Matsuyama City Station, the traffic rules changed from 6:00 on July 16, 2024. The Matsuyama City announcement (updated June 13, 2024) says the following.
市駅前ロータリーは、高速バスを含む路線バスと許可車両のみ通行できます。タクシーや一般車は通行できなくなるため、西側ロータリーを利用してください。
Translation: “Only route buses, including express buses, and permitted vehicles can pass through the City Station front rotary. Taxis and private cars can no longer pass, so please use the west rotary.”
From 0:00 (midnight) on October 15, 2024, the bus stops were gathered at the new east rotary. The city announcement also says of the east rotary, “高速バスを含む路線バスと許可車両のみ通行できます。タクシーや一般車は西側ロータリーを利用してください。” (Only route buses, including express buses, and permitted vehicles can pass. Taxis and private cars, please use the west rotary.)
About the place for pick-up and drop-off, the city page “Notice about the City Station front plaza improvement” (市駅前広場整備に関するお知らせ) says the following.
市駅前広場の西側ロータリーには、送迎用の一般車乗降場とタクシー降車場を設けています。
Translation: “At the west rotary of the City Station front plaza, we have provided a private car boarding and drop-off area for pick-up and drop-off, and a taxi drop-off area.”
この西側ロータリーへは、『花園町交差点』から進入でき、また、伊予鉄市駅西駐車場へも『花園町交差点』から西側ロータリーを経由した通行ルートをご利用いただけます。
Translation: “You can enter this west rotary from the Hanazono-machi intersection, and you can also use the route through the west rotary from the Hanazono-machi intersection to go to the Iyotetsu Shieki-nishi Parking.”
In other words, both when you drop off or pick up people and when you enter Shieki-nishi Parking, you enter the west rotary from Hanazono-machi intersection.
The same page also says that, from the end of February 2025, work to put a roof on the private car boarding and drop-off area and the taxi drop-off area of the west rotary would limit the boarding and drop-off space. The page does not give the date when the roof work ended. The page (updated October 16, 2026) says that the redevelopment of the Matsuyama City Station plaza was completed on September 30, 2026, and that a completion ceremony and an opening event would be held on October 3 and 4.

In the legend of the figure, the private car boarding and drop-off area, the taxi waiting area, the taxi boarding area, the taxi drop-off area, and the bus stops (boarding and drop-off) are drawn in different colors.
The spaces and fees of Shieki-nishi Parking are in Parking in central Matsuyama. If you drive on the same road as the city trams, see Rules for Driving on the Same Road as Trams in Matsuyama.
Rental car offices at the stations and the port: official pages of 4 offices
The rental car companies at Matsuyama Airport are in another article. Here we list 4 offices near JR Matsuyama Station and at Matsuyama Kanko Port whose address and directions could be confirmed on the company’s official page.
| Office | Address | Directions on the official page | Hours |
|---|---|---|---|
| Toyota Rent a Car Matsuyama (トヨタレンタカー 松山店) | 松山市宮田町109-6 あいおい損保松山ビル | 5 minutes on foot north along the Matsuyama Port Line (R19) from JR Matsuyama Station | 8:00 to 20:00 (January 4 to December 29), 8:00 to 17:00 (December 30 to January 2) |
| Nippon Rent-A-Car Matsuyama-ekimae (ニッポンレンタカー 松山駅前) | 松山市大手町2-5-10 | Leave JR Matsuyama Station by the “east exit” and go to the right, about 3 minutes on foot | 8:00 to 20:00 Monday to Sunday and on holidays (9:00 to 18:00 from December 31, 2026 to January 1, 2027) |
| ORIX Rent a Car Matsuyama-ekimae (オリックスレンタカー 松山駅前店) | 松山市三番町8-9-3 | 4 minutes on foot from JR Matsuyama Station | 8:00 to 19:00 (may differ at the year end and New Year, on holidays and so on) |
| Toyota Rent a Car Matsuyama Kanko Port (トヨタレンタカー 松山観光港店) | 松山市高浜町5丁目2259番地1 松山観光港ロビー内 | 1st floor of the Matsuyama Kanko Port lobby, boarding counter | 9:00 to 17:30 (January 5 to December 28). Closed on Saturdays, Sundays and holidays, and from December 29 to January 4 |
The Toyota Rent a Car pages also say the following.
- The Matsuyama office has a pick-up and drop-off service to hotels in the city and to Matsuyama Kanko Port (reservation by the day before is required). The phone number is 089-931-0100.
- The Matsuyama Kanko Port office has no pick-up and drop-off service. One-way (drop-off at a different place) returns are not possible. The phone field is the same 089-931-0100 as the Matsuyama office.
- The Matsuyama office is one-way, with returns possible from both inside and outside the prefecture.
The locations of the offices are shown on the next map. The marks on the map are the positions found by looking up the addresses in the GSI place name search (Miyata-machi lot 109, Otemachi 2-chome block 5, and Sanbancho 8-chome block 9), and are not the positions of the buildings.
The numbers match the list below and are not a driving order. Tap a number on the map, or "Navigate in Google Maps" in the list, to start directions to that place.
Point locations: GSI place name search (positions of address lot and block numbers), OpenStreetMap (JR Matsuyama Station; © OpenStreetMap contributors, ODbL)
- JR Matsuyama Station (JR松山駅): Nippon Rent-A-Car is about 3 minutes on foot from the east exit to the right, ORIX is 4 minutes on foot, and Toyota is 5 minutes on foot north along the Matsuyama Port Line.Navigate in Google Maps
- Toyota Rent a Car Matsuyama (トヨタレンタカー 松山店; 宮田町109-6): The mark is the position of Miyata-machi lot 109, not the exact position of the Aioi Sonpo Matsuyama Building.Navigate in Google Maps
- Nippon Rent-A-Car Matsuyama-ekimae (ニッポンレンタカー 松山駅前; 大手町2-5-10): The mark is the position of Otemachi 2-chome block 5, not the position of the building.Navigate in Google Maps
- ORIX Rent a Car Matsuyama-ekimae (オリックスレンタカー 松山駅前店; 三番町8-9-3): The mark is the position of Sanbancho 8-chome block 9, not the position of the building.Navigate in Google Maps
Not covered in this article
- The car travel time and distance between JR Matsuyama Station and Matsuyama City Station are not stated in the listed sources.
- The place to drop off people at Matsuyama Kanko Port, and the place where a car may stop briefly, are not on the port’s pages.
- The time limit, fee, free minutes and operator of the private car parking at the east exit of JR Matsuyama Station are not on the official pages of the city, the prefecture or JR Shikoku.
- A map of JR Matsuyama Station that shows where private cars may pick up and drop off people, and where stopping is not allowed, is not stated in the listed sources.
- Whether private cars can pick up and drop off people at the west exit of JR Matsuyama Station until the west plaza is built is not stated in the listed sources.
- The present state of the JR Matsuyama Station plaza is only up to the meeting document of October 6, 2026 (numbers from August and September) and the prefecture’s figure (on the page updated September 14, 2026).
- The fee, number of spaces and location of the Kisuke parking lot, and a map of the Iyotetsu Bus stops at JR Matsuyama Station, are not stated in the listed sources.
- This article does not cover the date when the roof work at the west rotary of Matsuyama City Station ended, or the layout of the boarding and drop-off areas after completion.
- This article does not cover private parking lots around Matsuyama Airport, Matsuyama Kanko Port and JR Matsuyama Station, or the individual guides of taxi companies.
- This article does not cover the offices at the stations and the port of other companies, such as Nissan, Budget, Times Car and Heisei Rent-a-Car.
About this article
What is written here was confirmed on October 17, 2026 on the official pages and documents of Matsuyama Airport, Matsuyama Kanko Port Terminal, Matsuyama City and the rental car companies. The JR Matsuyama Station section was checked on October 28, 2026 with the official pages and documents of Matsuyama City, Ehime Prefecture and JR Shikoku. The figures are images from the public documents of the airport, the port, the city and the prefecture, shown with their sources. The construction and traffic rules of the station plazas may change, so before you leave, please check the city’s “Notice about the City Station front plaza improvement” and “Notices about construction around JR Matsuyama Station” (JR松山駅周辺の工事に関するお知らせ), and the latest guidance of the airport and the terminal.
Sources
- 空港までのアクセス|交通アクセス|松山空港 (retrieved October 17, 2026)
- 車・バイク|交通アクセス|松山空港 (retrieved October 17, 2026)
- タクシー|交通アクセス|松山空港 (retrieved October 17, 2026)
- アクセス >>松山観光港ターミナル (retrieved October 17, 2026)
- 各種施設案内 >>松山観光港ターミナル (retrieved October 17, 2026)
- 松山市駅前広場の通行ルールが変わります 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- 市駅前広場の整備に合わせ、バス乗り場が東側ロータリーに集約されます 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- 市駅前広場整備に関するお知らせ 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- (市駅前広場整備 工事箇所図、松山市、PDF) (retrieved October 17, 2026)
- 第7回松山駅まち会議 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- (資料3 交通ターミナル機能について、第7回松山駅まち会議、松山市、PDF) (retrieved October 17, 2026)
- 第6回松山駅まち会議 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- (資料2 駅周辺の交通機能について、第6回松山駅まち会議、松山市、PDF) (retrieved October 17, 2026)
- 第1回松山駅まち会議 松山市公式ホームページ PCサイト (retrieved October 17, 2026)
- (資料2-5 駅前広場等整備基本計画検討、第1回松山駅まち会議、松山市、PDF) (retrieved October 17, 2026)
- JR松山駅周辺の工事進捗状況 松山市公式ホームページ PCサイト (retrieved October 28, 2026)
- JR松山駅・駅前広場計画 松山市公式ホームページ PCサイト (retrieved October 28, 2026)
- サクラメント通りの工事や松山駅西口南江戸線の開通に伴うお知らせ 松山市公式ホームページ PCサイト (retrieved October 28, 2026)
- サクラメント通り アンダーパス埋め戻し工事に伴うお知らせ 松山市公式ホームページ PCサイト (retrieved October 28, 2026)
- JR松山駅周辺整備事業の状況 - 愛媛県庁公式ホームページ(都市整備課) (retrieved October 28, 2026)
- (JR松山駅周辺整備事業の状況、愛媛県、PDF) (retrieved October 28, 2026)
- 都市計画道路松山駅西口南江戸線 - 愛媛県庁公式ホームページ(中予地方局鉄道高架課) (retrieved October 28, 2026)
- (都市計画道路 松山駅西口南江戸線の開通について、愛媛県中予地方局建設部鉄道高架課、PDF) (retrieved October 28, 2026)
- 四国の駅情報 | 松山駅:JR四国 (retrieved October 28, 2026)
- 駐車場【愛媛】 | JR四国 ステーション開発株式会社 松山支店 (retrieved October 28, 2026)
- OpenStreetMap(地点の位置。© OpenStreetMap contributors、ODbL) (retrieved October 28, 2026)
- 松山店|松山市(愛媛県)のレンタカー店舗ならトヨタレンタカー (retrieved October 17, 2026)
- 松山観光港店|松山市(愛媛県)のレンタカー店舗ならトヨタレンタカー (retrieved October 17, 2026)
- 松山駅前 | ニッポンレンタカー (retrieved October 17, 2026)
- オリックスレンタカー 松山駅前店の店舗情報|レンタカー予約 オリックスレンタカー (retrieved October 17, 2026)
Related articles
- Parking at Matsuyama Airport and where to stop for drop-off: spaces, fees, height limits, busy periods, and the road change inside the airport
- Leaving your car and taking a boat: parking spaces, fees, and hours at Ehime ports, and whether you can leave a car for long
- Matsuyama Parking Guide: Spaces, Fees, Hours, and Height Limits of City, Prefecture, and Railway Company Lots in the City Center
- From Matsuyama Kanko Port to Dogo Onsen: Prefectural Road 19 and Rokkenya-Ishite Line
- From Matsuyama Airport into the City, and Back Before Your Flight: Major Congestion Points and Times in Matsuyama City, as Written by the Ministry of Land, Infrastructure, Transport and Tourism
- What to know before renting a car at Matsuyama Airport